A little slow movement on the sugar shack is to bring in some stones for to put the building on top. I filled in the hole where the top soil was removed. I had to wait until a good dry spell before bringing the truck in — with 22+ tons of stones, never mind the weight of the truck — I didn’t want to have the tri-axle disappear into a hole. I don’t think we’re going to get to any construction this season but I can start working on the rocket mass stove when I have the chance, we’ll build right around the stove.
- I wish I had a dump truck!
- stones in and smoothed
- random spider web